What details should be paid attention to when installing LCD splicing screen? Listen to the small series in detail.
1. Cabinet-type and floor-standing bracket installation: the ground should be flat, the force-bearing area should be even, and a certain load-bearing capacity; wall-mounted and hydraulic bracket installation: the wall should be load-bearing, and the wall should be flat.
2. At the installation position of the LCD splicing screen, the various wires needed must be laid in advance.
LCD splicing screen
Third, in order to prevent signal interference, it is necessary to separate the strong cable from the weak cable through the trunking. Strong current generally refers to the power line, and weak current generally refers to the signal line.
Fourth, the light around the LCD splicing screen installation location should not be too strong. Although the brightness of the LCD splicing screen is very high, if the light is too strong, the picture may be blurred. If it is installed near a window, please draw up the curtains when using it.
LCD splicing screen
5. When installing the ordinary wall-mounted embedded, the screen needs to be left 5 cm up, down, left and right for easy installation, and can be wrapped (detachable) for easy after-sales. When the front maintenance hydraulic support is pre-buried and installed, leave 5 mm on the top, bottom, left, and right sides of the screen.
Sixth, the power supply system should operate normally, the voltage should be stable, the three-phase should be as balanced as possible, and the load power of each line should be basically equal.
7. If the working environment of the splicing screen is equipped with fire fighting equipment, the fire sprinkler should be about 2 meters away from the splicing unit.